§ Type 04 — Application

Agricultural

Safeguard barns, machinery sheds, packhouses and farming infrastructure during wildfire season.

Rainmaker® roof protection installed on a agricultural property
§ Overview

Perimeter configuration — AGR

Safeguard barns, machinery sheds, packhouses and farming infrastructure during wildfire season.

Long-throw perimeter configuration for farm buildings and boundary lines, running from farm water with a pump rather than a municipal connection.

Use the Rainmaker System Designer to configure the modular platform to your architecture, water source and roofline — the calculator returns module count, layout and pricing in under two minutes.

§ Intended applications

Specified for these environments.

  • Barns, machinery sheds and implement stores
  • Packhouses, cold stores and processing buildings
  • Workers' housing and farmstead roofs
  • Boundary lines where veld meets vineyard or orchard blocks
  • Farmyard perimeters and fuel or feed storage areas
Not specified for
  • Crop irrigation duty — the configuration is specified for protection saturation
§ Engineering specifications

Specified for agricultural conditions.

Only the data relevant to this configuration is listed. Quantities and total flow are confirmed for your property in the Preliminary Protection Design Report.

Module & nozzle configuration

Module length
6 m
Flexible sprinkler heads per module
2 (long-throw nozzle)
Nozzle type
Long-throw, wind-resistant large-droplet
Perimeter per module
6 m, joined end-to-end
Nominal flow per module
≈ 1 500 L/h

Mounting & installation

Mounting position
Shed and packhouse ridges, or perimeter posts and walls
Bracket
UV-stabilised PVC bracket for permanent outdoor exposure
Fixing method
Screw-fixed and epoxy bonded
Serviceability
Individual modules isolated without dropping the run
Installation route
Farm maintenance team or plumber

Coverage

Spray radius (per sprinkler head)
12 metres
Coverage pattern
Continuous overlapping wetted band along the run
Protected zone
Building roof plus adjoining ground and fuel load
Run strategy
Sustained through the front and following ember fall

Water supply & flow requirements

Minimum operating pressure
2 bar at inlet
Typical source
Borehole, dam, reservoir or farm storage
Booster pump
Farm pump duty confirmed against run length
Pre-season check
Flow test at the pump before fire season
Control
Manual valve at the pump or header
§ Engineering notes

Why this configuration is built the way it is.

  • Perimeter runs are laid out against the prevailing fire approach, not around the full property boundary.
  • Runs can be extended or reconfigured as blocks, fence lines and fuel loads change between seasons.
  • Pump duty, not module count, usually sets the practical run length on farm supplies.