§ Commercial

Scale is a module count, not a redesign.

Warehouses, factories and commercial estates protected by grouping Rainmaker® modules into independently controlled zones.

Rainmaker® roof protection installed on a commercial property
§ Overview

Zoned protection across large roof areas.

Large commercial roofs are long runs with high water demand. Rainmaker® Commercial handles that by dividing the roof into zones — each an independently valved group of standard 6-metre modules — so flow stays within the capability of the site supply.

The geometry never changes: two flexible heads per module, 12-metre spray radius each, modules joined end-to-end. Coverage grows by adding modules and zones, which keeps the bill of materials, the hydraulics and the installation method predictable at any building size.

6 m
Module length
2
Heads / module
12 m
Spray radius
2 bar
Min. pressure
§ Why facilities specify it

Protects stock and continuity

A wetted roof envelope defends inventory, plant and the trading days that follow an incident.

Zoned to the water supply

Zones are activated individually, matching demand to available flow instead of oversizing the supply.

Roof or exterior wall

Modules mount along the ridge or on external walls where the exposure sits.

Heat load reduction

Wetting a large steel roof in summer lowers surface temperature and the cooling load beneath it.

§ How it works

Activate the zones under threat.

01

Assess exposure

Site procedure identifies which elevations face the fire front.

02

Open those zones

Zone valves are opened individually, so flow is committed where it is needed.

03

Envelope saturation

Each zone's modules saturate their section of roof and the surrounding protection band.

04

Extend or stand down

Open further zones as conditions shift, then close valves once the threat clears.

§ Engineering drawings

Zoned commercial layout.

6 m MODULE · 2 HEADSRIDGE-MOUNTED PIPEWORKUPWARD OVERLAPPING SPRAY · 12 m RADIUS PER HEAD

Standard modules grouped into independently valved zones along a long commercial ridge, with continuous overlap maintained inside each zone.

§ Key features

Specified for facilities teams.

Independent zone control

Each zone is separately valved for staged activation across a large roof.

Standard module throughout

One part number scales the whole building — simple stores and spares.

Wall-mount option

Exposed elevations and boundary walls can carry their own module runs.

Pressure-regulated network

Uniform droplet size and radius from the first module to the last on long runs.

Plumber-installable

Conventional plumbing skills and tools — no proprietary trade certification.

Documented on site

QR code at the manifold links to the current installation and operating guide.

§ Technical specifications

Commercial configuration data.

Zone count, module count and total flow are determined per building and confirmed in the Preliminary Protection Design Report.

Module & zone configuration

Module length
6 m (standard part throughout)
Flexible sprinkler heads per module
2
Zoning
Independently valved zones, configured per building
Nominal flow per module
≈ 1 500 L/h
Scaling method
Add modules and zones — geometry unchanged

Mounting & installation

Mounting position
Roof ridge and/or exposed exterior walls
Bracket
UV-stabilised PVC ridge or wall bracket
Fixing method
Screw-fixed and epoxy bonded to approved surface
Manifold
Zone valves grouped at an accessible manifold
Installation route
Registered plumber / contractor

Coverage

Spray radius (per sprinkler head)
12 metres
Coverage strategy
Continuous overlap maintained within each zone
Activation
Zone-by-zone, matched to the exposed elevation
Protected surfaces
Roof envelope, parapets, wall faces, perimeter band

Water supply & flow requirements

Minimum operating pressure
2 bar at inlet, per active zone
Flow planning
Peak demand calculated on simultaneous zones only
Typical source
Municipal main, site tanks or fire reserve
Booster pump
Sized to the largest simultaneous zone group
Control
Manual zone valves at the manifold
  • Zoning is the primary engineering tool: it keeps flow within the available supply instead of oversizing the connection.
  • One module part number across the building simplifies facilities stores and spares holding.
  • The site QR code at the manifold links to the current installation and operating guidance.
§ Intended applications

Specified for these environments.

  • Retail centres, offices and mixed-use commercial buildings
  • Warehouses and distribution facilities
  • Long single-ridge roofs requiring staged activation
  • Exposed elevations and boundary walls carrying their own runs
  • Summer roof-temperature and cooling-load reduction
Not specified for
  • Process-hazard or flammable-liquid fire suppression duties
§ System designer

Size your building.